Why Category 3 Demands HAZMAT Response in New Boston
Most water damage emergencies in New Boston start with aging combined sewer overflow during nor'easter and heavy rain events. A close second is frozen and burst sewer laterals releasing contaminated water. From the second water touches the property, every minute changes what gets saved and what gets ripped out.
New Boston experiences heavy spring rains and cold winters, which contribute to sewer overflows and frozen pipes, increasing black water contamination risks.
Most category 3 black water cleanup calls in New Boston come from aging combined sewer overflow during nor'easter and heavy rain events. Running a close second is frozen and burst sewer laterals releasing contaminated water. Once water sits unaddressed past 24 to 48 hours, microbial growth starts and the job gets a lot more expensive.

